Lounsbury (Transit, UL1, UL3) Three teams go surveying...
All posts by Bill Gee
02/01/03 – Miller (UL3 team1)
We headed back to the start of UL3 and continued into the passage to the start of our leads.
02/01/03 – Lerch (UL3 team2)
This is some upper paleo-passage with sand over clay floors, and ceiling heights that rarely exceeded 4'.
01/11/03 – Lounsbury (Transit)
Jan. 2003, Transit (Lounsbury)
01/11/03 – Miller (Round Room)
Jan. 2003, Round Room (Miller)